Welcome to Cypress Reserve

Four thoughtfully designed homes on a private cul-de-sac, each shaped around generous spaces, enduring materials, and the way life is lived now.

Four

New Homes

3,516-5,683

Above-grade Sqft.

0.45-0.73

Acres

Spring 2027

Anticipated Start

43 Cypress Road

Four homes. One considered setting.

At the end of a private paved road in Natick, 43 Cypress is a small collection of detached new-construction homes by Morrell Construction. Each plan pairs the ease of public water and sewer with the privacy of a wooded setting.

Lots 1 through 3 begin with over 3,500 square feet of above-grade living area. Lot 4 offers a more expansive 5,683-square-foot layout. Select homes offer the opportunity to finish a walk-out lower level, and Lots 1 and 2 also include an optional third-floor finish.

Explore the Homes

Choose the layout that fits what comes next.

Each home is offered through a separate construction agreement with Morrell Construction. Detailed pricing and the buyer process are available directly from TEAM Metrowest.

4 BED | 3.5 BATH

Lot 1

• 3,516 Sq. Ft.
• 0.58 acres
• 2-car garage
• Optional finished lower level + third floor

4 BED | 3.5 BATH

Lot 2

• 3,516 Sq. Ft.
• 0.57 acres
• 2-car garage
• Optional finished lower level + third floor

Built With Intention

The details that make a difference.

Modern Systems

Heat-pump heating and cooling, three zones, and 400-amp electrical service are planned across the community.

Enduring materials

Fiber-cement siding, engineered hardwood, tile, stone or solid-surface counters, and insulated windows and doors.

Flexible space

Each home includes a full walk-out lower level, with optional finished space available for future needs.

Everyday ease

Public water and sewer, attached garages, paved driveways, and a private paved cul-de-sac create a strong everyday foundation.

Building at Cypress Reserve

A clear path from lot to home.

1.) Choose your lot.

Explore the four home plans and the setting that fits you best.

2.) Work with the builder.

Purchasers enter into a separate construction agreement with Morrell Construction.

3.) Plan ahead.

Construction is anticipated to begin in spring 2027, with a targeted 8-10 month completion period.

Building plans on table